Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Stevens Institute of Technology |
---|---|
Assessment Year | 1985 |
Principal Product | HEAT TREATING & BRAZING |
NAICS | n/a |
SIC | 3498 - Fabricated Pipe And Fittings |
Sales | $1,000,000-$5,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 2,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $435,031 | 5,415,885 | kWh | $0.08 |
Natural Gas | $203,968 | 35,051 | MMBtu | $5.82 |
Fuel Oil #2 | $10,000 | 1,540 | MMBtu | $6.49 |
Other Energy | $1,200 | 149 | MMBtu | $8.05 |
TOTAL ENERGY COSTS | $650,199 | |||
RECOMMENDED SAVINGS* | $36,568 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,609 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Other Energy | Electricity Usage | Natural Gas | Fuel Oil #2 | Other Energy | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,895 Cost: $16,240 |
$7,895 | 98,183 | - | - | - | - | - | - |
$7,895 98,183 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $294 Cost: $150 |
$294 | 3,810 | - | - | - | - | - | - |
$294 3,810 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,188 Cost: $120 |
$4,188 | 52,169 | - | - | - | - | - | - |
$4,188 52,169 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,095 Cost: $1,200 |
$1,095 | 13,775 | - | - | - | - | - | - |
$1,095 13,775 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $382 Cost: $1,100 |
$382 | 4,689 | - | - | - | - | - | - |
$382 4,689 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $6,972 Cost: $11,200 |
$8,404 | 104,631 | $(-1,432) | (-246) | - | - | - | - |
$8,404 104,631 kWh |
$(-1,432) (-246) MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7494 INSTALL STORM WINDOWS AND DOORS |
Savings: $1,148 Cost: $2,025 |
- | - | $1,148 | 197 | - | - | - | - |
- - kWh |
$1,148 197 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $4,210 Cost: - |
- | - | $4,210 | 723 | - | - | - | - |
- - kWh |
$4,210 723 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $617 Cost: $200 |
- | - | $617 | 106 | - | - | - | - |
- - kWh |
$617 106 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $819 Cost: $1,950 |
- | - | $819 | 141 | - | - | - | - |
- - kWh |
$819 141 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $119 Cost: - |
- | - | $119 | 20 | - | - | - | - |
- - kWh |
$119 20 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY |
Savings: $5,779 Cost: $300 |
- | - | $5,779 | 993 | - | - | - | - |
- - kWh |
$5,779 993 MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE |
Savings: $3,050 Cost: $6,397 |
- | - | - | - | $2,750 | 347 | $300 | 37 |
- - kWh |
- - MMBtu |
$2,750 347 MMBtu |
$300 37 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,568 Cost: $40,882 |
$22,258 | 277,257 | $11,260 | 1,934 | $2,750 | 347 | $300 | 37 | $22,258 277,257 kWh |
$11,260 1,934 MMBtu |
$2,750 347 MMBtu |
$300 37 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,609 Cost: $26,082 |
$12,465 | 155,041 | $6,094 | 1,046 | $2,750 | 347 | $300 | 37 | $12,465 155,041 kWh |
$6,094 1,046 MMBtu |
$2,750 347 MMBtu |
$300 37 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Other Energy | Electricity Usage | Natural Gas | Fuel Oil #2 | Other Energy |