IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0265 # 02 Y:2008 02 2008 USE SYNTHETIC LUBRICANT $191 $0 Not Implemented
SU0265 # 03 Y:2008 03 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $214,622 $23,800 Not Implemented
SU0265 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,615 $252 Implemented
SU0265 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $786 $223 Implemented
SU0265 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,263 $3,368 Not Implemented
SU0265 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $171 $310 Not Implemented
SU0265 # 08 Y:2008 08 2008 OPTIMIZE PLANT POWER FACTOR $921 $4,079 Not Implemented
SU0158 # 01 Y:2003 01 2003 REPAIR OR REPLACE STEAM TRAPS $161,780 $4,536 Implemented
SU0158 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152,410 $301,250 Not Implemented
SU0158 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $95,164 $235,000 Not Implemented
SU0158 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $67,325 $5,200 Implemented
SU0158 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $24,189 $70,275 Not Implemented
SU0158 # 06 Y:2003 06 2003 USE SYNTHETIC LUBRICANT $10,573 $1,000 Implemented
SU0158 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,432 $0 Implemented
SU0158 # 08 Y:2003 08 2003 RECOVER AND REUSE SPENT ACID BATHS $7,052 $6,521 Not Implemented
SU0158 # 09 Y:2003 09 2003 $5,056 $0 Implemented
SU0158 # 10 Y:2003 10 2003 $4,599 $0 Implemented
SU0158 # 11 Y:2003 11 2003 $2,892 $0 Implemented
SU0158 # 12 Y:2003 12 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,302 $3,256 Not Implemented
SU0128 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $151 $0 Implemented
SU0128 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $573 $0 Not Implemented
SU0128 # 03 Y:2002 03 2002 $1,088 $0 Implemented
SU0128 # 04 Y:2002 04 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,141 $2,364 Not Implemented
SU0128 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,395 $0 Implemented
SU0128 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $1,486 $7,000 Not Implemented