IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,226

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0611 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $500 Implemented
AM0611 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,110 $2,500 Not Implemented
AM0611 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,220 $62 Not Implemented
AM0611 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,200 $710 Not Implemented
AM0611 # 07 Y:2012 07 2012 PAY UTILITY BILLS ON TIME $1,700 $0 Implemented
AM0611 # 08 Y:2012 08 2012 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,300 $1,030 Not Implemented
AM0611 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $1,900 Not Implemented
AM0611 # 10 Y:2012 10 2012 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $180 $0 Not Implemented
UM0400 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,282 $47,885 Not Implemented
UM0400 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,755 $17,500 Not Implemented
UM0400 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,437 $4,000 Not Implemented
UM0400 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,410 $200 Not Implemented
UM0400 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $3,287 $5,040 Not Implemented
UM0400 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $706 $10 Not Implemented
UM0400 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,660 $4,000 Not Implemented
UM0400 # 08 Y:2012 08 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,447 $4,000 Not Implemented
MAS023 # 01 Y:2012 01 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,820 $44,000 Implemented
MAS023 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,502 $7,500 Implemented
MAS023 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,970 $8,500 Implemented
MAS023 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,899 $9,580 Implemented
MAS023 # 05 Y:2012 05 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,978 $3,000 Not Implemented
MAS023 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,575 $3,130 Not Implemented
MAS023 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $596 $0 Implemented
CO0656 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $630 Implemented
CO0656 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,770 $53,300 Implemented