Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
203
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0235 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,628 | $0 | Not Implemented |
IC0235 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,555 | $1,224 | Not Implemented |
IC0235 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $1,398 | $3,402 | Not Implemented |
IC0235 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,357 | $32,486 | Not Implemented |
IP0095 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,935 | $25 | Implemented |
IP0095 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,822 | $835 | Not Implemented |
IP0095 # 11 Y:2018 | 11 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $843 | $1,000 | Not Implemented |
IP0095 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,327 | $3,124 | Not Implemented |
IP0095 # 08 Y:2018 | 08 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,700 | $6,580 | Not Implemented |
IP0095 # 09 Y:2018 | 09 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,060 | $2,194 | Not Implemented |
IP0095 # 10 Y:2018 | 10 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,136 | $3,970 | Implemented |
IP0095 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $2,961 | $1,093 | Implemented |
IP0095 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $68,255 | $11,125 | Implemented |
IP0095 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,356 | $3,070 | Implemented |
IP0095 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,023 | $2,041 | Implemented |
IP0081 # 10 Y:2017 | 10 | 2017 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $1,766 | $3,788 | Not Implemented |
IP0081 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $201 | $409 | Implemented |
IP0081 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $72 | $0 | Implemented |
IP0081 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $832 | $1,358 | Implemented |
IP0081 # 01 Y:2017 | 01 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,110 | $0 | Implemented |
IP0081 # 07 Y:2017 | 07 | 2017 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $1,643 | $1,949 | Not Implemented |
IP0081 # 06 Y:2017 | 06 | 2017 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $25 | $17 | Not Implemented |
IP0081 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,798 | $35 | Implemented |
IP0081 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,216 | $0 | Implemented |
IP0081 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,865 | $390 | Implemented |