Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0135 # 11 Y:1984 | 11 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,487 | $1,300 | Not Implemented |
KU0135 # 22 Y:1984 | 22 | 1984 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $368 | $10 | Implemented |
KU0135 # 21 Y:1984 | 21 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $495 | $0 | Not Implemented |
KU0135 # 20 Y:1984 | 20 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $496 | $400 | Not Implemented |
KU0135 # 19 Y:1984 | 19 | 1984 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $905 | $300 | Implemented |
KU0135 # 18 Y:1984 | 18 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,061 | $1,400 | Not Implemented |
KU0135 # 17 Y:1984 | 17 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,359 | $3,150 | Not Implemented |
KU0135 # 16 Y:1984 | 16 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $659 | $125 | Not Implemented |
KU0135 # 15 Y:1984 | 15 | 1984 | IMPROVE LUBRICATION PRACTICES | $1,143 | $25 | Not Implemented |
KU0135 # 14 Y:1984 | 14 | 1984 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,763 | $3,100 | Implemented |
KU0135 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,886 | $78 | Implemented |
KU0135 # 01 Y:1984 | 01 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,770 | $17,000 | Not Implemented |
KU0135 # 10 Y:1984 | 10 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,389 | $5,000 | Implemented |
KU0135 # 09 Y:1984 | 09 | 1984 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $4,203 | $100 | Implemented |
KU0135 # 08 Y:1984 | 08 | 1984 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,591 | $7,800 | Not Implemented |
KU0135 # 07 Y:1984 | 07 | 1984 | IMPROVE LUBRICATION PRACTICES | $6,508 | $2,250 | Not Implemented |
KU0135 # 06 Y:1984 | 06 | 1984 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,809 | $3,750 | Not Implemented |
KU0135 # 05 Y:1984 | 05 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,516 | $2,774 | Not Implemented |
KU0135 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,716 | $2,000 | Implemented |
KU0135 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $194 | $0 | Implemented |
KU0135 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $9,768 | $0 | Implemented |