Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
122
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0554 # 02 Y:2024 | 02 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,907 | $0 | n/a |
SU0554 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,596 | $0 | n/a |
SU0554 # 03 Y:2024 | 03 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $124 | $0 | n/a |
SU0554 # 04 Y:2024 | 04 | 2024 | DISCONNECT BALLASTS | $25 | $0 | n/a |
SU0554 # 05 Y:2024 | 05 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,553 | $84 | n/a |
SU0554 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $82,048 | $526,750 | n/a |
SU0554 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $355 | $466 | n/a |
SU0554 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,419 | $54 | n/a |
SU0554 # 09 Y:2024 | 09 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $12,437 | $105,375 | n/a |
SU0525 # 09 Y:2022 | 09 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $207 | $487 | Not Implemented |
SU0525 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,482 | $0 | Not Implemented |
SU0525 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $108 | $13 | Not Implemented |
SU0525 # 06 Y:2022 | 06 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,807 | $3,000 | Not Implemented |
SU0525 # 07 Y:2022 | 07 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $12,346 | $12,588 | Not Implemented |
SU0525 # 08 Y:2022 | 08 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $305 | $664 | Not Implemented |
SU0525 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,804 | $450 | Not Implemented |
SU0525 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,215 | $2,239 | Not Implemented |
SU0525 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,101 | $350 | Not Implemented |
SU0514 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46 | $49 | Not Implemented |
SU0514 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,996 | $9,943 | Not Implemented |
SU0514 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,219 | $1,953 | Not Implemented |
SU0514 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $22,430 | $675 | Not Implemented |
SU0514 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,774 | $3,179 | Not Implemented |
SU0514 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,008 | $0 | Not Implemented |
LE0497 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $13,727 | $10,000 | Not Implemented |