Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0554 # 02 Y:2024 02 2024 PAY BILLS ON TIME TO AVOID LATE FEES $1,907 $0 n/a
SU0554 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,596 $0 n/a
SU0554 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $124 $0 n/a
SU0554 # 04 Y:2024 04 2024 DISCONNECT BALLASTS $25 $0 n/a
SU0554 # 05 Y:2024 05 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,553 $84 n/a
SU0554 # 08 Y:2024 08 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $82,048 $526,750 n/a
SU0554 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $355 $466 n/a
SU0554 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,419 $54 n/a
SU0554 # 09 Y:2024 09 2024 USE HEAT PUMP FOR SPACE CONDITIONING $12,437 $105,375 n/a
SU0525 # 09 Y:2022 09 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $207 $487 Not Implemented
SU0525 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,482 $0 Not Implemented
SU0525 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $108 $13 Not Implemented
SU0525 # 06 Y:2022 06 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,807 $3,000 Not Implemented
SU0525 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $12,346 $12,588 Not Implemented
SU0525 # 08 Y:2022 08 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $305 $664 Not Implemented
SU0525 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,804 $450 Not Implemented
SU0525 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,215 $2,239 Not Implemented
SU0525 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,101 $350 Not Implemented
SU0514 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46 $49 Not Implemented
SU0514 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,996 $9,943 Not Implemented
SU0514 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,219 $1,953 Not Implemented
SU0514 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,430 $675 Not Implemented
SU0514 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,774 $3,179 Not Implemented
SU0514 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,008 $0 Not Implemented
LE0497 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,727 $10,000 Not Implemented