IAC logo
IAC Assessment: SU0554
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0554
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2024
Principal Product Valves and Hydrants
NAICS 332911 - Industrial Valve Manufacturing
SIC 3491 - Industrial Valves
Sales $100,000,000-$500,000,000
# of Employees 321
Plant Area (Sq.Ft.) 466,000
Annual Production 171,808 Units
Production Hrs. Annual 4,420
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,798,077 37,089,137 kWh $0.05
Electricity Demand $391,909 174,614 kW-months/year $2.24
Electricity Fees $26,699 - $ -
Natural Gas $684,614 124,471 MMBtu $5.50
LPG $94,423 2,636 MMBtu $35.82
Fuel Oil #1 $2,530 85 MMBtu $29.70
Other Gas $39,010 1 MMBtu $39,010.36
TOTAL ENERGY COSTS $3,037,262
RECOMMENDED SAVINGS* $123,465 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$19,596
Cost:
-
- - $19,596 8,731 - - - - - - - - - - -
-
kWh
$19,596
8,731
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,907
Cost:
-
- - - - - - - - - - - - $1,907 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
$1,907
-
$
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$124
Cost:
-
- - $124 55 - - - - - - - - - - -
-
kWh
$124
55
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$25
Cost:
-
$20 421 $5 2 - - - - - - - - - - $20
421
kWh
$5
2
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$5,553
Cost:
$84
- - - - - - - - - - - - $5,553 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
$5,553
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,419
Cost:
$54
$1,845 38,250 $471 210 $(-897) (-163) - - - - - - - - $1,845
38,250
kWh
$471
210
kW-months/year
$(-897)
(-163)
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$355
Cost:
$466
$282 5,869 $18 8 - - - - - - $55 - - - $282
5,869
kWh
$18
8
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$55
-
$
-
-
$
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$82,048
Cost:
$526,750
$(-14,904) (-310,505) - - - - $94,423 2,636 $2,530 85 - - - - $(-14,904)
(-310,505)
kWh
-
-
kW-months/year
-
-
MMBtu
$94,423
2,636
MMBtu
$2,530
85
MMBtu
-
-
$
-
-
$
09: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$12,437
Cost:
$105,375
$(-8,034) (-167,365) - - $20,471 3,722 - - - - - - - - $(-8,034)
(-167,365)
kWh
-
-
kW-months/year
$20,471
3,722
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$123,465
Cost:
$632,729
$(-20,790) (-433,330) $20,214 9,006 $19,574 3,559 $94,423 2,636 $2,530 85 $55 - $7,460 - $(-20,790)
(-433,330)
kWh
$20,214
9,006
kW-months/year
$19,574
3,559
MMBtu
$94,423
2,636
MMBtu
$2,530
85
MMBtu
$55
-
$
$7,460
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 Personnel Changes Administrative Changes