Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
242
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0581 # 05 Y:2024 | 05 | 2024 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $921 | $4,500 | n/a |
LE0581 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,575 | $12,275 | n/a |
LE0581 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,580 | $11,000 | n/a |
LE0581 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,702 | $910 | n/a |
LE0581 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $336 | $270 | n/a |
DL0221 # 13 Y:2023 | 13 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $53,076 | $20,000 | Implemented |
DL0221 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $30,683 | $0 | Implemented |
DL0221 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,723 | $0 | Implemented |
DL0221 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,286 | $3,000 | Not Implemented |
DL0221 # 12 Y:2023 | 12 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,218 | $1,080 | Implemented |
DL0221 # 04 Y:2023 | 04 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $781 | $0 | Implemented |
DL0221 # 08 Y:2023 | 08 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $75 | $200 | Not Implemented |
DL0221 # 10 Y:2023 | 10 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,279 | $1,500 | Not Implemented |
DL0221 # 11 Y:2023 | 11 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $812 | $2,301 | Implemented |
DL0221 # 09 Y:2023 | 09 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $2,678 | $610 | Implemented |
DL0221 # 05 Y:2023 | 05 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $740 | $1,500 | Not Implemented |
DL0221 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $293 | $0 | Implemented |
DL0221 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $4,684 | $500 | Implemented |
DL0221 # 15 Y:2023 | 15 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,042 | $10,688 | Not Implemented |
DL0221 # 16 Y:2023 | 16 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,688 | $4,615 | Implemented |
DL0221 # 14 Y:2023 | 14 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,645 | $500 | Implemented |
CW0123 # 08 Y:2022 | 08 | 2022 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $7,698 | $5,000 | n/a |
CW0123 # 06 Y:2022 | 06 | 2022 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $2,357 | $0 | n/a |
CW0123 # 05 Y:2022 | 05 | 2022 | USE OPTIMUM TEMPERATURE | $4,521 | $3,500 | n/a |
CW0123 # 02 Y:2022 | 02 | 2022 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $1,422 | $4,000 | n/a |