Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0147 # 13 Y:2008 | 13 | 2008 | UPGRADE OBSOLETE EQUIPMENT | $17,075 | $5,520 | Implemented |
IC0147 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,889 | $55,200 | Implemented |
IC0147 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,453 | $75,348 | Implemented |
IC0147 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,138 | $1,380 | Implemented |
IC0147 # 15 Y:2008 | 15 | 2008 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $5,100 | $0 | Implemented |
IC0147 # 05 Y:2008 | 05 | 2008 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $395 | $250 | Implemented |
IC0147 # 08 Y:2008 | 08 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,952 | $15,562 | Implemented |
IC0147 # 11 Y:2008 | 11 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,598 | $9,911 | Implemented |
IC0147 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,527 | $30,225 | Implemented |
MZ0024 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,181 | $32,800 | Implemented |
MZ0024 # 03 Y:2008 | 03 | 2008 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $828 | $370 | Not Implemented |
IC0147 # 06 Y:2008 | 06 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $24,605 | $0 | Implemented |
IC0147 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $1,712 | $2,967 | Implemented |
MZ0024 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM THICKNESS INSULATION | $430 | $800 | Not Implemented |
IC0147 # 14 Y:2008 | 14 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,784 | $8,670 | Implemented |
IC0147 # 04 Y:2008 | 04 | 2008 | DISCONNECT BALLASTS | $4,311 | $4,750 | Implemented |
IC0147 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $133 | $398 | Implemented |
MZ0024 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,506 | $5,600 | Not Implemented |
IC0147 # 09 Y:2008 | 09 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $200 | $246 | Implemented |
MZ0024 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $764 | $900 | Implemented |
LE0277 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,555 | $1,000 | Not Implemented |
LE0277 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,432 | $200 | Not Implemented |
LE0277 # 08 Y:2008 | 08 | 2008 | USE SOLAR HEAT TO HEAT WATER | $354 | $1,260 | Not Implemented |
LE0277 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,555 | $3,555 | Not Implemented |
LE0277 # 10 Y:2008 | 10 | 2008 | INSTALL OCCUPANCY SENSORS | $755 | $60 | Not Implemented |