Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
67
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0251 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,595 | $100 | Not Implemented |
UA0251 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $24,626 | $4,208 | Not Implemented |
UA0251 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $7,062 | $1,190 | Not Implemented |
UA0251 # 05 Y:2021 | 05 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,641 | $128 | Not Implemented |
UA0251 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,263 | $2,002 | Not Implemented |
DL0200 # 09 Y:2021 | 09 | 2021 | USE HEAT PUMP FOR SPACE CONDITIONING | $3,788 | $5,060 | Not Implemented |
DL0200 # 08 Y:2021 | 08 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $75,171 | $186,000 | Not Implemented |
DL0200 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,430 | $36,000 | Not Implemented |
DL0200 # 06 Y:2021 | 06 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $30,035 | $121,361 | Implemented |
DL0200 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,055 | $3,275 | Not Implemented |
DL0200 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,182 | $0 | Implemented |
DL0200 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,899 | $200 | Not Implemented |
DL0200 # 02 Y:2021 | 02 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,955 | $0 | Implemented |
DL0200 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,029 | $0 | Not Implemented |
MI0399 # 07 Y:2021 | 07 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,286 | $4,468 | Implemented |
MI0399 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $54,060 | $240,000 | Implemented |
MI0399 # 06 Y:2021 | 06 | 2021 | METER WASTE WATER | $4,166 | $900 | Not Implemented |
MI0399 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,405 | $1,670 | Implemented |
MI0399 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,245 | $70,400 | Implemented |
MI0399 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,020 | $320 | Implemented |
MI0399 # 01 Y:2021 | 01 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $115,960 | $157,500 | Not Implemented |
SD0608 # 06 Y:2021 | 06 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $544 | $1,695 | Not Implemented |
SD0608 # 03 Y:2021 | 03 | 2021 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,270 | $7,600 | Not Implemented |
SD0608 # 04 Y:2021 | 04 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,201 | $6,200 | Not Implemented |
SD0608 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,361 | $152,000 | Not Implemented |