IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

371

matching recommendations
Reset
SIC 3492 Fluid Power Valves & Hose Fittings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0117 # 01 Y:2018 01 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $61,479 $72,000 Not Implemented
WM0117 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,220 $39,050 Not Implemented
WM0117 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,440 $42,800 Implemented
WM0117 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,804 $2,793 Not Implemented
WM0117 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,936 $4,135 Not Implemented
WM0117 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $1,885 $1,980 Implemented
WM0117 # 08 Y:2018 08 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,390 $2,469 Not Implemented
WM0117 # 09 Y:2018 09 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $487 $864 Not Implemented
BD0474 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,390 $50 Not Implemented
BD0474 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $782 $425 Implemented
BD0474 # 11 Y:2016 11 2016 USE POWER DURING OFF-PEAK PERIODS $829 $50 Not Implemented
BD0474 # 10 Y:2016 10 2016 RECOVER WASTE HEAT FROM EQUIPMENT $963 $3,000 Not Implemented
BD0474 # 09 Y:2016 09 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,161 $50 Not Implemented
BD0474 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,294 $2,500 Not Implemented
BD0474 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,446 $563 Implemented
BD0474 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,746 $400 Implemented
BD0474 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,078 $40 Not Implemented
BD0474 # 03 Y:2016 03 2016 USE RADIANT HEATER FOR SPOT HEATING $4,570 $9,000 Not Implemented
BD0474 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,083 $2,300 Implemented
BD0474 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $6,050 $2,475 Implemented
MI0286 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $920 $1,670 Not Implemented
MI0286 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,382 $40 Not Implemented
MI0286 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,433 $5,370 Not Implemented
MI0286 # 06 Y:2015 06 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,819 $11,872 Not Implemented
MI0286 # 05 Y:2015 05 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,778 $4,691 Not Implemented