IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
SIC 3493 Steel Springs, Except Wire
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0076 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $4,492 $7,920 Implemented
MO0076 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,747 $4,462 Implemented
MO0076 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,316 $735 Not Implemented
MO0076 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,141 $318 Implemented
OK0379 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $0 Implemented
OK0379 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,182 $200 Implemented
OK0379 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $89 $108 Implemented
OK0379 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,070 $2,500 Implemented
UD0339 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,489 $0 Implemented
UD0339 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,089 $0 Implemented
UD0339 # 03 Y:1991 03 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $678 $5,000 Implemented
WI0070 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,544 $28,341 Implemented
WI0070 # 02 Y:1989 02 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $16,961 $0 Implemented
WI0070 # 03 Y:1989 03 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,871 $2,400 Not Implemented
WI0070 # 04 Y:1989 04 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,122 $250 Not Implemented
WI0070 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,255 $1,000 Not Implemented
WI0070 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $409 $0 Implemented
OK0059 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $473 $283 Not Implemented
OK0059 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $204 $600 Not Implemented
OK0059 # 03 Y:1982 03 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $122 $0 Not Implemented
OK0059 # 04 Y:1982 04 1982 LOWER CEILING TO REDUCE CONDITIONED SPACE $230 $1,137 Implemented
OK0059 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $422 $500 Not Implemented
OK0059 # 06 Y:1982 06 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,097 $984 Implemented