IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 3493 Steel Springs, Except Wire
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0178 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,171 $709 Not Implemented
IC0178 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,221 $14,399 Implemented
IC0178 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,180 $3,286 Implemented
IC0178 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $754 $4,000 Implemented
IC0178 # 06 Y:2010 06 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,949 $6,377 Not Implemented
IC0178 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,701 $2,530 Not Implemented
IC0178 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $843 $0 Not Implemented
IC0178 # 09 Y:2010 09 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $0 Implemented
IC0178 # 10 Y:2010 10 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $694 $0 Not Implemented
IC0178 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,297 $244 Not Implemented
IC0142 # 04 Y:2008 04 2008 USE RADIANT HEATER FOR SPOT HEATING $216 $620 Not Implemented
IC0142 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,469 $1,150 Implemented
IC0142 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $203 Implemented
IC0142 # 06 Y:2008 06 2008 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $2,442 $0 Implemented
IC0142 # 03 Y:2008 03 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $697 $90 Not Implemented
IC0142 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,855 $9,432 Implemented
IC0142 # 01 Y:2008 01 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $1,099 $488 Implemented
IC0142 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $507 Implemented
IC0142 # 09 Y:2008 09 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $482 $0 Not Implemented
IC0142 # 10 Y:2008 10 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,501 $0 Implemented
IC0142 # 11 Y:2008 11 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $734 $5,429 Implemented
IC0142 # 12 Y:2008 12 2008 INSTALL OCCUPANCY SENSORS $711 $1,402 Implemented
IC0142 # 13 Y:2008 13 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,171 $0 Implemented
IC0142 # 14 Y:2008 14 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,835 $16,294 Not Implemented
IC0142 # 15 Y:2008 15 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,846 $11,800 Implemented