IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
SIC 3493 Steel Springs, Except Wire
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0831 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,257 $750 Implemented
OK0831 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,802 $0 Implemented
OK0831 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,398 $52,500 Implemented
OK0831 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,712 $1,746 Not Implemented
OK0831 # 05 Y:2012 05 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $209,307 $450,000 Not Implemented
OK0831 # 06 Y:2012 06 2012 INSTALL SET-BACK TIMERS $661 $650 Implemented
OK0379 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $0 Implemented
OK0379 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,182 $200 Implemented
OK0379 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $89 $108 Implemented
OK0379 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,070 $2,500 Implemented
OK0059 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $473 $283 Not Implemented
OK0059 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $204 $600 Not Implemented
OK0059 # 03 Y:1982 03 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $122 $0 Not Implemented
OK0059 # 04 Y:1982 04 1982 LOWER CEILING TO REDUCE CONDITIONED SPACE $230 $1,137 Implemented
OK0059 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $422 $500 Not Implemented
OK0059 # 06 Y:1982 06 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,097 $984 Implemented