IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3494 Valves And Pipe Fittings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0176 # 08 Y:2001 08 2001 COMBINE UTILITY METERS $1,333 $1,500 Not Implemented
BD0176 # 07 Y:2001 07 2001 MODIFY CURRENT INCENTIVE PROGRAM $15,600 $10,000 Not Implemented
BD0176 # 06 Y:2001 06 2001 MINIMIZE WATER USAGE $524 $575 Not Implemented
BD0176 # 05 Y:2001 05 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $12,394 $15,000 Not Implemented
BD0176 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,269 $600 Not Implemented
BD0176 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,853 $1,300 Implemented
BD0176 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $8,517 $5,700 Not Implemented
BD0176 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,662 $12,500 Not Implemented
BD0084 # 02 Y:1997 02 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $7,164 $3,500 Not Implemented
BD0084 # 11 Y:1997 11 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $5,726 $2,500 Implemented
BD0084 # 10 Y:1997 10 1997 MOVE PRODUCT USING MECHANICAL MEANS $16,677 $1,380 Not Implemented
BD0084 # 09 Y:1997 09 1997 MINIMIZE WATER USAGE $512 $875 Not Implemented
BD0084 # 08 Y:1997 08 1997 RECOVER AND REUSE COOLING WATER $8,749 $7,500 Implemented
BD0084 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,425 $1,200 Not Implemented
BD0084 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $1,580 $675 Not Implemented
BD0084 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,205 $11,750 Not Implemented
BD0084 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,816 $4,933 Not Implemented
BD0084 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $4,774 $6,850 Not Implemented
BD0084 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,581 $5,500 Implemented
WI0245 # 01 Y:1995 01 1995 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,645 $10,000 Not Implemented
WI0245 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,239 $2,000 Implemented
WI0245 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $722 $1,946 Implemented
WI0245 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $141 $300 Not Implemented
WI0245 # 05 Y:1995 05 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $720 $700 Not Implemented
WI0245 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $351 $1,000 Implemented