IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

547

matching recommendations
Reset
SIC 3494 Valves And Pipe Fittings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0079 # 03 Y:1986 03 1986 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $887 $1,800 Not Implemented
LT0079 # 04 Y:1986 04 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,361 $750 Implemented
GT0267 # 01 Y:1985 01 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,275 $3,300 Not Implemented
GT0267 # 02 Y:1985 02 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,200 $16,250 Not Implemented
GT0267 # 03 Y:1985 03 1985 COVER OPEN TANKS $3,200 $600 Implemented
GT0267 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,640 $450 Implemented
GT0267 # 05 Y:1985 05 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,968 $3,547 Not Implemented
GT0267 # 06 Y:1985 06 1985 AIR CONDITION ONLY SPACE NECESSARY $1,860 $1,000 Implemented
TN0257 # 01 Y:1985 01 1985 USE HEAT PUMP FOR SPACE CONDITIONING $17,233 $429,000 Not Implemented
TN0257 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,904 $37,200 Not Implemented
TN0257 # 03 Y:1985 03 1985 COVER OPEN TANKS $3,102 $200 Not Implemented
TN0257 # 04 Y:1985 04 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,915 $0 Not Implemented
TN0257 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,048 $450 Implemented
GT0263 # 01 Y:1985 01 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,700 $82,000 Implemented
GT0263 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,934 $75 Not Implemented
GT0263 # 03 Y:1985 03 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,500 $3,000 Not Implemented
GT0263 # 04 Y:1985 04 1985 COVER OPEN TANKS $1,100 $320 Not Implemented
GT0263 # 05 Y:1985 05 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $787 $3,679 Implemented
GT0263 # 06 Y:1985 06 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $21,300 $400 Implemented
OK0160 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $622 $100 Implemented
OK0160 # 02 Y:1985 02 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,464 $300 Implemented
OK0160 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $2,869 $5,000 Not Implemented
OK0160 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $386 $500 Not Implemented
GT0249 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,317 $500 Implemented
GT0249 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $277 Implemented