26
matching recommendationsSIC | 3494 | Valves And Pipe Fittings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TS0011 # 03 Y:1984 | 03 | 1984 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $10,415 | $0 | Not Implemented |
TS0011 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $246 | $0 | Not Implemented |
TS0011 # 08 Y:1984 | 08 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $481 | $800 | Not Implemented |
TS0011 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $242 | $500 | Not Implemented |
TS0011 # 05 Y:1984 | 05 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $217 | $0 | Not Implemented |
TS0011 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $677 | $2,376 | Not Implemented |
TS0011 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,244 | $500 | Not Implemented |
ST0003 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,017 | $537 | Implemented |
ST0003 # 09 Y:1984 | 09 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $681 | $436 | Implemented |
ST0003 # 08 Y:1984 | 08 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $447 | $0 | Not Implemented |
ST0003 # 07 Y:1984 | 07 | 1984 | INSTALL STORM WINDOWS AND DOORS | $668 | $209 | Not Implemented |
ST0003 # 06 Y:1984 | 06 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,004 | $940 | Implemented |
ST0003 # 05 Y:1984 | 05 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $156 | $0 | Implemented |
ST0003 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $786 | $2,035 | Implemented |
ST0003 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,227 | $24 | Implemented |
ST0003 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,925 | $372 | Implemented |
UD0138 # 03 Y:1984 | 03 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,854 | $30,000 | Not Implemented |
UD0138 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,759 | $336 | Implemented |
UD0138 # 02 Y:1984 | 02 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,379 | $15,000 | Implemented |
OK0126 # 13 Y:1984 | 13 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $123 | $36 | Implemented |
OK0126 # 09 Y:1984 | 09 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,416 | $704 | Implemented |
OK0126 # 05 Y:1984 | 05 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,231 | $1,913 | Implemented |
OK0126 # 04 Y:1984 | 04 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $253 | $365 | Implemented |
OK0126 # 03 Y:1984 | 03 | 1984 | REDUCE VENTILATION AIR | $1,502 | $12 | Implemented |
OK0126 # 02 Y:1984 | 02 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $153 | $211 | Implemented |