Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 3494 | Valves And Pipe Fittings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0014 # 08 Y:2001 | 08 | 2001 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $131,040 | $36,250 | n/a |
LM0014 # 07 Y:2001 | 07 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $8,000 | $1,000 | n/a |
LM0014 # 06 Y:2001 | 06 | 2001 | INSTALL SENSORS TO DETECT DEFECTS | $22,000 | $2,800 | n/a |
LM0014 # 05 Y:2001 | 05 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,820 | $12,500 | n/a |
LM0014 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,883 | $263 | n/a |
LM0014 # 03 Y:2001 | 03 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $189 | $300 | n/a |
LM0014 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,545 | $250 | n/a |
LM0014 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $149 | $145 | n/a |
LM0003 # 04 Y:2001 | 04 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,824 | $0 | Implemented |
LM0003 # 06 Y:2001 | 06 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $7,268 | $1,500 | Not Implemented |
LM0003 # 05 Y:2001 | 05 | 2001 | MAINTAIN MACHINES TO REDUCE LEAKS | $750 | $350 | Implemented |
LM0003 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,731 | $460 | Implemented |
LM0003 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,862 | $0 | Implemented |
LM0003 # 01 Y:2001 | 01 | 2001 | INSTALL SKYLIGHTS | $1,651 | $4,100 | Not Implemented |
BD0176 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,662 | $12,500 | Not Implemented |
BD0176 # 08 Y:2001 | 08 | 2001 | COMBINE UTILITY METERS | $1,333 | $1,500 | Not Implemented |
BD0176 # 07 Y:2001 | 07 | 2001 | MODIFY CURRENT INCENTIVE PROGRAM | $15,600 | $10,000 | Not Implemented |
BD0176 # 06 Y:2001 | 06 | 2001 | MINIMIZE WATER USAGE | $524 | $575 | Not Implemented |
BD0176 # 05 Y:2001 | 05 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $12,394 | $15,000 | Not Implemented |
BD0176 # 04 Y:2001 | 04 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,269 | $600 | Not Implemented |
BD0176 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,853 | $1,300 | Implemented |
BD0176 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $8,517 | $5,700 | Not Implemented |