IAC logo
IAC Assessment: LM0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product valves
NAICS n/a
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $5,000,000-$10,000,000
# of Employees 28
Plant Area (Sq.Ft.) 18,000
Annual Production 15,000 Pieces
Production Hrs. Annual 2,040
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,803 219,186 kWh $0.08
Electricity Demand $11,449 1,464 kW-months/year $7.82
Electricity Fees $4,768 - $ -
Natural Gas $2,172 219 MMBtu $9.92
TOTAL ENERGY COSTS $36,192
RECOMMENDED SAVINGS* $18,086 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,167
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$1,651
Cost:
$4,100
$788 9,698 $863 101 - - - - $788
9,698
kWh
$863
101
kW-months/year
-
-
gal
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,862
Cost:
-
$1,176 14,464 $686 80 - - - - $1,176
14,464
kWh
$686
80
kW-months/year
-
-
gal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,731
Cost:
$460
$2,356 28,999 $1,375 157 - - - - $2,356
28,999
kWh
$1,375
157
kW-months/year
-
-
gal
-
-
$
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$2,824
Cost:
-
$1,898 23,340 $926 108 - - - - $1,898
23,340
kWh
$926
108
kW-months/year
-
-
gal
-
-
$
05: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$750
Cost:
$350
- - - - $750 - - - -
-
kWh
-
-
kW-months/year
$750
-
gal
-
-
$
06: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$7,268
Cost:
$1,500
- - - - - - $7,268 - -
-
kWh
-
-
kW-months/year
-
-
gal
$7,268
-
$
TOTAL RECOMMENDED Savings:
$18,086
Cost:
$6,410
$6,218 76,501 $3,850 446 $750 - $7,268 - $6,218
76,501
kWh
$3,850
446
kW-months/year
$750
-
gal
$7,268
-
$
TOTAL IMPLEMENTED Savings:
$9,167
Cost:
$810
$5,430 66,803 $2,987 345 $750 - - - $5,430
66,803
kWh
$2,987
345
kW-months/year
$750
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes