Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2001 |
Principal Product | valves |
NAICS | n/a |
SIC | 3494 - Valves And Pipe Fittings, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 28 |
Plant Area (Sq.Ft.) | 18,000 |
Annual Production | 15,000 Pieces |
Production Hrs. Annual | 2,040 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $16,803 | 219,186 | kWh | $0.08 |
Electricity Demand | $11,449 | 1,464 | kW-months/year | $7.82 |
Electricity Fees | $4,768 | - | $ | - |
Natural Gas | $2,172 | 219 | MMBtu | $9.92 |
TOTAL ENERGY COSTS | $36,192 | |||
RECOMMENDED SAVINGS* | $18,086 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,167 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7145 INSTALL SKYLIGHTS |
Savings: $1,651 Cost: $4,100 |
$788 | 9,698 | $863 | 101 | - | - | - | - |
$788 9,698 kWh |
$863 101 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,862 Cost: - |
$1,176 | 14,464 | $686 | 80 | - | - | - | - |
$1,176 14,464 kWh |
$686 80 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,731 Cost: $460 |
$2,356 | 28,999 | $1,375 | 157 | - | - | - | - |
$2,356 28,999 kWh |
$1,375 157 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $2,824 Cost: - |
$1,898 | 23,340 | $926 | 108 | - | - | - | - |
$1,898 23,340 kWh |
$926 108 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS |
Savings: $750 Cost: $350 |
- | - | - | - | $750 | - | - | - |
- - kWh |
- - kW-months/year |
$750 - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS |
Savings: $7,268 Cost: $1,500 |
- | - | - | - | - | - | $7,268 | - |
- - kWh |
- - kW-months/year |
- - gal |
$7,268 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $18,086 Cost: $6,410 |
$6,218 | 76,501 | $3,850 | 446 | $750 | - | $7,268 | - | $6,218 76,501 kWh |
$3,850 446 kW-months/year |
$750 - gal |
$7,268 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,167 Cost: $810 |
$5,430 | 66,803 | $2,987 | 345 | $750 | - | - | - | $5,430 66,803 kWh |
$2,987 345 kW-months/year |
$750 - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes |