IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
SIC 3495 Wire Springs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0608 # 01 Y:2021 01 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,361 $152,000 Not Implemented
SD0608 # 06 Y:2021 06 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $544 $1,695 Not Implemented
SD0608 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,225 $143 Not Implemented
SD0608 # 03 Y:2021 03 2021 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,270 $7,600 Not Implemented
SD0608 # 04 Y:2021 04 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,201 $6,200 Not Implemented
SD0608 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,468 $18,900 Not Implemented
UD0978 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,107 $1,000 Not Implemented
UD0978 # 07 Y:2017 07 2017 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $37,937 $100,000 Not Implemented
UD0978 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79,415 $79,850 Not Implemented
UD0978 # 08 Y:2017 08 2017 COVER OPEN TANKS $7,466 $5,000 Not Implemented
UD0978 # 05 Y:2017 05 2017 ADD AREA LIGHTING SWITCHES $2,220 $180 Not Implemented
UD0978 # 06 Y:2017 06 2017 USE OPTIMUM THICKNESS INSULATION $86,982 $91,480 Not Implemented
UD0978 # 03 Y:2017 03 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,562 $1,000 Not Implemented
UD0978 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,058 $0 Not Implemented
UD0978 # 09 Y:2017 09 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $562 $0 Not Implemented
IP0081 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,865 $390 Implemented
IP0081 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,216 $0 Implemented
IP0081 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,798 $35 Implemented
IP0081 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $201 $409 Implemented
IP0081 # 10 Y:2017 10 2017 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $1,766 $3,788 Not Implemented
IP0081 # 06 Y:2017 06 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $25 $17 Not Implemented
IP0081 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $1,358 Implemented
IP0081 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,110 $0 Implemented
IP0081 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $72 $0 Implemented
IP0081 # 07 Y:2017 07 2017 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,643 $1,949 Not Implemented