IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

661

matching recommendations
Reset
SIC 3496 Misc. Fabricated Wire Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0277 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,555 $1,000 Not Implemented
LE0277 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,354 $15,000 Not Implemented
LE0277 # 03 Y:2008 03 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,444 $500 Not Implemented
LE0277 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,656 $130 Not Implemented
LE0277 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,432 $200 Not Implemented
LE0277 # 06 Y:2008 06 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,194 $2,500 Not Implemented
LE0277 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $884 $800 Not Implemented
LE0277 # 08 Y:2008 08 2008 USE SOLAR HEAT TO HEAT WATER $354 $1,260 Not Implemented
LE0277 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,555 $3,555 Not Implemented
LE0277 # 10 Y:2008 10 2008 INSTALL OCCUPANCY SENSORS $755 $60 Not Implemented
BD0344 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,551 $474 Not Implemented
BD0344 # 02 Y:2008 02 2008 USE PHOTOCELL CONTROLS $3,786 $991 Not Implemented
BD0344 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,657 $1,021 Not Implemented
BD0344 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,483 $101 Not Implemented
BD0344 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $75,203 $20,001 Not Implemented
BD0344 # 06 Y:2008 06 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $15,215 $7,501 Not Implemented
BD0344 # 07 Y:2008 07 2008 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $43,004 $11,201 Not Implemented
BD0344 # 08 Y:2008 08 2008 USE RADIANT HEATER FOR SPOT HEATING $16,854 $27,001 Not Implemented
LL0281 # 01 Y:2007 01 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,512 $735 Implemented
LL0281 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $9,842 $1,585 Implemented
LL0281 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,804 $2,400 Implemented
LL0281 # 04 Y:2007 04 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,988 $120 Implemented
LL0281 # 05 Y:2007 05 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,808 $900 Implemented
LL0281 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $1,708 $1,588 Implemented
LL0281 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $740 $525 Not Implemented