Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2008 |
Principal Product | Shopping Carts & Wire Displays |
NAICS | 333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3496 - Misc. Fabricated Wire Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 121 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 1 Units |
Production Hrs. Annual | 6,760 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $386,943 | 3,636,789 | kWh | $0.11 |
Electricity Demand | $96,000 | 24,000 | kW-months/year | $4.00 |
Natural Gas | $149,614 | 20,495 | MMBtu | $7.30 |
TOTAL ENERGY COSTS | $632,557 | |||
RECOMMENDED SAVINGS* | $160,753 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,551 Cost: $474 |
$1,425 | 17,813 | $126 | 32 | - | - | - | - | - | - |
$1,425 17,813 kWh |
$126 32 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $3,786 Cost: $991 |
$650 | 8,128 | $274 | 68 | - | - | $2,490 | - | $372 | - |
$650 8,128 kWh |
$274 68 kW-months/year |
- - MMBtu |
$2,490 - $ |
$372 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,657 Cost: $1,021 |
$1,522 | 19,030 | $135 | 34 | - | - | - | - | - | - |
$1,522 19,030 kWh |
$135 34 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,483 Cost: $101 |
$3,459 | 43,235 | $24 | 6 | - | - | - | - | - | - |
$3,459 43,235 kWh |
$24 6 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $75,203 Cost: $20,001 |
- | - | - | - | $75,203 | 10,302 | - | - | - | - |
- - kWh |
- - kW-months/year |
$75,203 10,302 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $15,215 Cost: $7,501 |
- | - | - | - | $15,215 | 2,084 | - | - | - | - |
- - kWh |
- - kW-months/year |
$15,215 2,084 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $43,004 Cost: $11,201 |
- | - | - | - | $43,004 | 7,098 | - | - | - | - |
- - kWh |
- - kW-months/year |
$43,004 7,098 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $16,854 Cost: $27,001 |
- | - | - | - | $16,854 | 2,308 | - | - | - | - |
- - kWh |
- - kW-months/year |
$16,854 2,308 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $160,753 Cost: $68,291 |
$7,056 | 88,206 | $559 | 140 | $150,276 | 21,792 | $2,490 | - | $372 | - | $7,056 88,206 kWh |
$559 140 kW-months/year |
$150,276 21,792 MMBtu |
$2,490 - $ |
$372 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||