IAC logo
IAC Assessment: BD0344
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0344
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2008
Principal Product Shopping Carts & Wire Displays
NAICS 333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 121
Plant Area (Sq.Ft.) 55,000
Annual Production 1 Units
Production Hrs. Annual 6,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $386,943 3,636,789 kWh $0.11
Electricity Demand $96,000 24,000 kW-months/year $4.00
Natural Gas $149,614 20,495 MMBtu $7.30
TOTAL ENERGY COSTS $632,557
RECOMMENDED SAVINGS* $160,753 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,551
Cost:
$474
$1,425 17,813 $126 32 - - - - - - $1,425
17,813
kWh
$126
32
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,786
Cost:
$991
$650 8,128 $274 68 - - $2,490 - $372 - $650
8,128
kWh
$274
68
kW-months/year
-
-
MMBtu
$2,490
-
$
$372
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,657
Cost:
$1,021
$1,522 19,030 $135 34 - - - - - - $1,522
19,030
kWh
$135
34
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,483
Cost:
$101
$3,459 43,235 $24 6 - - - - - - $3,459
43,235
kWh
$24
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$75,203
Cost:
$20,001
- - - - $75,203 10,302 - - - - -
-
kWh
-
-
kW-months/year
$75,203
10,302
MMBtu
-
-
$
-
-
$
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$15,215
Cost:
$7,501
- - - - $15,215 2,084 - - - - -
-
kWh
-
-
kW-months/year
$15,215
2,084
MMBtu
-
-
$
-
-
$
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$43,004
Cost:
$11,201
- - - - $43,004 7,098 - - - - -
-
kWh
-
-
kW-months/year
$43,004
7,098
MMBtu
-
-
$
-
-
$
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$16,854
Cost:
$27,001
- - - - $16,854 2,308 - - - - -
-
kWh
-
-
kW-months/year
$16,854
2,308
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$160,753
Cost:
$68,291
$7,056 88,206 $559 140 $150,276 21,792 $2,490 - $372 - $7,056
88,206
kWh
$559
140
kW-months/year
$150,276
21,792
MMBtu
$2,490
-
$
$372
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material