Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 3496 Misc. Fabricated Wire Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0145 # 03 Y:1999 03 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $15,332 $945 Not Implemented
DS0145 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,985 $8 Implemented
DS0145 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,434 $462 Implemented
IA0194 # 07 Y:1998 07 1998 USE POWER DURING OFF-PEAK PERIODS $11,884 $0 Not Implemented
IA0194 # 06 Y:1998 06 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $74,880 $52,000 Not Implemented
IA0194 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $877 $15 Not Implemented
IA0194 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $1,500 $1,695 Not Implemented
IA0194 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,197 $4,877 Implemented
IA0194 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,917 $3,000 Not Implemented
IA0194 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,107 $21,359 Implemented
DS0024 # 08 Y:1995 08 1995 INSTALL TIMERS AND/OR THERMOSTATS $899 $1,050 Not Implemented
DS0024 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $176 $240 Not Implemented
DS0024 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $604 $45 Not Implemented
DS0024 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $1,416 $9,400 Not Implemented
DS0024 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $387 $856 Not Implemented
DS0024 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,101 $4,673 Implemented
DS0024 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $546 $600 Not Implemented
DS0024 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,142 $5,331 Not Implemented