Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1998
Principal Product tire and industrial chains
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 325,000
Annual Production 19,000 Tons
Production Hrs. Annual 7,488
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $431,270 13,729,777 kWh $0.03
Electricity Demand $209,493 27,912 kW-months/year $7.51
Natural Gas $235,176 81,052 MMBtu $2.90
TOTAL ENERGY COSTS $918,019
RECOMMENDED SAVINGS* $109,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,304
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,107
Cost:
$21,359
$9,517 303,048 $3,590 480 - - - - - - $9,517
303,048
kWh
$3,590
480
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,917
Cost:
$3,000
- - - - $4,917 1,731 - - - - -
-
kWh
-
-
kW-months/year
$4,917
1,731
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,197
Cost:
$4,877
$1,123 35,756 $1,074 144 - - - - - - $1,123
35,756
kWh
$1,074
144
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,500
Cost:
$1,695
- - - - $1,500 528 - - - - -
-
kWh
-
-
kW-months/year
$1,500
528
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$877
Cost:
$15
$635 20,223 $242 32 - - - - - - $635
20,223
kWh
$242
32
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$74,880
Cost:
$52,000
- - - - - - $74,880 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$74,880
-
$
-
-
$
07: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$11,884
Cost:
-
- - - - - - $(-986) - $12,870 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-986)
-
$
$12,870
-
$
TOTAL RECOMMENDED Savings:
$109,362
Cost:
$82,946
$11,275 359,027 $4,906 656 $6,417 2,259 $73,894 - $12,870 - $11,275
359,027
kWh
$4,906
656
kW-months/year
$6,417
2,259
MMBtu
$73,894
-
$
$12,870
-
$
TOTAL IMPLEMENTED Savings:
$15,304
Cost:
$26,236
$10,640 338,804 $4,664 624 - - - - - - $10,640
338,804
kWh
$4,664
624
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes