IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,117

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0227 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $2,910 Implemented
WV0227 # 10 Y:2001 10 2001 RECOVER WASTE HEAT FROM EQUIPMENT $16,267 $3,000 Not Implemented
WV0227 # 11 Y:2001 11 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,814 $100 Implemented
WV0227 # 12 Y:2001 12 2001 ADJUST PH FOR NEUTRALIZATION $8,625 $13,725 Not Implemented
WV0227 # 13 Y:2001 13 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,200 $75 Implemented
WV0227 # 14 Y:2001 14 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $110,000 $85,000 Not Implemented
IC0011 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,132 $1,600 Implemented
IC0011 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,072 $55,760 Not Implemented
IC0011 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $623 $1,370 Not Implemented
IC0011 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,689 $8,460 Not Implemented
IC0011 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,107 $2,401 Implemented
IC0011 # 06 Y:2001 06 2001 MODIFY WORKLOAD $128,000 $55,800 Implemented
LL0108 # 01 Y:2001 01 2001 PAY UTILITY BILLS ON TIME $268 $0 Implemented
LL0108 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $2,400 $0 Implemented
LL0108 # 03 Y:2001 03 2001 COMBINE UTILITY METERS $240 $0 Not Implemented
LL0108 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,889 $300 Implemented
LL0108 # 05 Y:2001 05 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,100 $0 Not Implemented
CO0484 # 01 Y:2001 01 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,050 $8,660 n/a
CO0484 # 02 Y:2001 02 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,440 $1,670 n/a
CO0484 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,610 $390 n/a
CO0484 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,010 $4,000 n/a
CO0484 # 05 Y:2001 05 2001 USE SOLAR HEAT TO HEAT MAKE-UP AIR $2,110 $12,600 n/a
CO0484 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $30 n/a
CO0484 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $520 $0 n/a
CO0484 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $34,130 $7,350 n/a