IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0187 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,150 $50 Implemented
WV0187 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,205 $134 Not Implemented
WV0187 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $427 $100 Implemented
WV0187 # 05 Y:2000 05 2000 USE SYNTHETIC LUBRICANT $1,056 $350 Implemented
WV0187 # 06 Y:2000 06 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $569 $300 Not Implemented
WV0187 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $740 Implemented
WV0187 # 08 Y:2000 08 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,120 $1,350 Not Implemented
WV0187 # 09 Y:2000 09 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $28,444 $15,958 Implemented
WV0187 # 10 Y:2000 10 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $252 $50 Implemented
WV0187 # 11 Y:2000 11 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $5,304 $75 Implemented
WV0187 # 12 Y:2000 12 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,000 $7,000 Not Implemented
WV0187 # 13 Y:2000 13 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,000 $1,200 Not Implemented
UD0373 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $6,664 $8,600 Implemented
UD0373 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,724 $0 Implemented
UD0373 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $5,415 $3,000 Not Implemented
UD0373 # 04 Y:1992 04 1992 METER WASTE WATER $14,996 $300,000 Implemented
UD0373 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,143 $15,000 Not Implemented
UD0332 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $741 $624 Implemented
UD0332 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,333 $0 Implemented
UD0332 # 03 Y:1991 03 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,459 $0 Implemented
UD0332 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,479 $0 Implemented
UD0292 # 01 Y:1989 01 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $664 $2,400 Not Implemented
UD0292 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,465 $233 Implemented
UD0292 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,528 $0 Not Implemented
UD0292 # 04 Y:1989 04 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,582 $15,000 Not Implemented