IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0250 # 04 Y:1992 04 1992 REDUCE VENTILATION AIR $6,040 $1,270 Implemented
CO0250 # 05 Y:1992 05 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,939 $8,660 Implemented
CO0250 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $450 $150 Implemented
CO0250 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $350 $300 Implemented
CO0250 # 08 Y:1992 08 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,410 $6,230 Implemented
CO0250 # 09 Y:1992 09 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,900 $8,300 Implemented
CO0250 # 10 Y:1992 10 1992 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $810 $2,600 Implemented
CO0250 # 11 Y:1992 11 1992 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $140 $240 Implemented
CO0250 # 12 Y:1992 12 1992 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $240 $1,120 Implemented
IA0028 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $437 Implemented
IA0028 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $1,954 $1,701 Implemented
IA0028 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,105 $50 Implemented
IA0028 # 06 Y:1992 06 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $66 $20 Implemented
IA0030 # 02 Y:1992 02 1992 REDUCE VENTILATION AIR $3,352 $0 Implemented
IA0030 # 03 Y:1992 03 1992 USE RADIANT HEATER FOR SPOT HEATING $4,443 $12,690 Implemented
IA0030 # 08 Y:1992 08 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $357 $4,230 Implemented
IA0030 # 09 Y:1992 09 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $383 $200 Implemented
IA0030 # 10 Y:1992 10 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,681 $250 Implemented
IA0032 # 01 Y:1992 01 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,136 $2,585 Implemented
IA0032 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,143 $2,806 Implemented
IA0032 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314 $500 Implemented
IA0032 # 08 Y:1992 08 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $68 $183 Implemented
RU0154 # 01 Y:1992 01 1992 IMPROVE LUBRICATION PRACTICES $351 $800 Implemented
RU0154 # 02 Y:1992 02 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,622 $0 Implemented
RU0154 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,405 $2,500 Implemented