Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,093
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0348 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,917 | $1,548 | Implemented |
MZ0348 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $13,016 | $3,000 | Implemented |
SD0636 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,654 | $4,172 | Implemented |
MU0026 # 10 Y:2023 | 10 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,402 | $0 | Implemented |
MU0026 # 07 Y:2023 | 07 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,405 | $0 | Implemented |
MU0026 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $419 | $1,650 | Implemented |
MU0026 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $101,263 | $0 | Implemented |
MU0026 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $905 | $133 | Implemented |
MU0026 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,370 | $6,347 | Implemented |
UU0220 # 01 Y:2023 | 01 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $67,069 | $0 | Implemented |
UU0220 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,986 | $13,500 | Implemented |
UU0220 # 05 Y:2023 | 05 | 2023 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,160 | $50 | Implemented |
UU0220 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $920 | $1,200 | Implemented |
GT0966 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,382 | $9,263 | Implemented |
GT0966 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $63,527 | $1,850 | Implemented |
GT0966 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $32,835 | $800 | Implemented |
WV0641 # 04 Y:2023 | 04 | 2023 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $42,136 | $4,100 | Implemented |
WV0641 # 06 Y:2023 | 06 | 2023 | REDUCE VENTILATION AIR | $16,843 | $4,400 | Implemented |
WV0641 # 07 Y:2023 | 07 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,857 | $5,425 | Implemented |
WV0641 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $917 | $933 | Implemented |
WV0641 # 09 Y:2023 | 09 | 2023 | INSULATE BARE EQUIPMENT | $402 | $758 | Implemented |
SD0631 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $754 | $1,124 | Implemented |
AM0876 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $20,029 | $25,217 | Implemented |
AM0876 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,373 | $63 | Implemented |
WM0196 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $380 | $0 | Implemented |