IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

618

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0427 # 02 Y:2002 02 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,439 $400 Implemented
WI0427 # 03 Y:2002 03 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,046 $1,000 Not Implemented
WI0420 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,849 $203,000 Not Implemented
WI0420 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,868 $933 Implemented
WI0420 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,832 $1,601 Not Implemented
WI0420 # 04 Y:2002 04 2002 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,012 $0 Not Implemented
WI0420 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $993 $2,094 Not Implemented
WI0420 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $576 $640 Implemented
WI0420 # 07 Y:2002 07 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $315 $543 Implemented
WI0420 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $315 $0 Not Implemented
WI0417 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,160 $2,000 Implemented
WI0417 # 02 Y:2002 02 2002 TREAT AND REUSE RINSE WATERS $7,660 $8,000 Implemented
WI0417 # 03 Y:2002 03 2002 REPLACE CLOTH RAGS WITH PAPER TOWELS $4,700 $0 Not Implemented
WI0417 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,600 $1,100 Not Implemented
WI0417 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,453 $1,560 Not Implemented
WI0417 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,606 $339 Implemented
WI0417 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,318 $740 Implemented
WI0417 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $923 $1,647 Implemented
WI0416 # 01 Y:2002 01 2002 RECOVER AND REUSE WASTE MATERIAL $2,010 $8,000 Not Implemented
WI0416 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $3,608 $400 Implemented
WI0416 # 03 Y:2002 03 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,968 $0 Implemented
WI0416 # 04 Y:2002 04 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,080 $0 Not Implemented
WI0416 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,925 $90 Implemented
WI0416 # 06 Y:2002 06 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,387 $0 Not Implemented
WI0416 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,411 $6,600 Implemented