IAC logo
IAC Assessment: WI0427
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0427
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Comp. Air Controls
NAICS n/a
SIC 3567 - Industrial Furnaces And Ovens
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 50,000
Annual Production 5,750 Units
Production Hrs. Annual 2,125
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $18,824 552,240 kWh $0.03
Electricity Demand $30,562 2,954 kW-months/year $10.35
Electricity Fees $5,005 - $ -
Natural Gas $22,780 26,194 MMBtu $0.87
TOTAL ENERGY COSTS $79,211
RECOMMENDED SAVINGS* $74,909 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,830
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$66,300
Cost:
$1,000
- - - - - - $66,300 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$66,300
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,439
Cost:
$400
- - - - $4,439 550 - - - - -
-
kWh
-
-
kW-months/year
$4,439
550
MMBtu
-
-
$
-
-
$
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$2,046
Cost:
$1,000
- - - - - - - - $2,046 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,046
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,091
Cost:
$3,136
$493 13,689 $598 55 - - - - - - $493
13,689
kWh
$598
55
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7314 REDUCE VENTILATION AIR Savings:
$522
Cost:
$500
$492 57 $30 829 - - - - - - $492
57
kWh
$30
829
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$391
Cost:
$740
$70 1,935 $321 29 - - - - - - $70
1,935
kWh
$321
29
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$120
Cost:
-
$58 1,598 $62 6 - - - - - - $58
1,598
kWh
$62
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$74,909
Cost:
$6,776
$1,113 17,279 $1,011 919 $4,439 550 $66,300 - $2,046 - $1,113
17,279
kWh
$1,011
919
kW-months/year
$4,439
550
MMBtu
$66,300
-
$
$2,046
-
$
TOTAL IMPLEMENTED Savings:
$4,830
Cost:
$1,140
$70 1,935 $321 29 $4,439 550 - - - - $70
1,935
kWh
$321
29
kW-months/year
$4,439
550
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material