IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,137

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0039 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,163 $16,183 Implemented
TT0039 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1 $0 Implemented
TT0039 # 03 Y:2009 03 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $77,380 $7,000 Implemented
TT0039 # 04 Y:2009 04 2009 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $36,266 $12,000 Implemented
TT0039 # 05 Y:2009 05 2009 IMPROVE COMBUSTION CONTROL CAPABILITY $112,568 $64,000 Not Implemented
TT0039 # 06 Y:2009 06 2009 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,012 $250 Not Implemented
TT0039 # 07 Y:2009 07 2009 OPTIMIZE PLANT POWER FACTOR $11,430 $13,000 Not Implemented
SD0417 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,063 $19,400 Not Implemented
SD0417 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,436 $26,587 Not Implemented
SD0417 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,630 $4,249 Not Implemented
SD0417 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,003 $16,190 Not Implemented
SD0417 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,392 $14,325 Not Implemented
SD0417 # 06 Y:2009 06 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $43,985 $8,096 Not Implemented
OK0779 # 01 Y:2009 01 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,513 $900,000 Not Implemented
OK0779 # 02 Y:2009 02 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $122,608 $160,000 Not Implemented
OK0779 # 03 Y:2009 03 2009 USE POWER DURING OFF-PEAK PERIODS $30,940 $0 Not Implemented
OK0779 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,076 $6,396 Not Implemented
OK0779 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,634 $26,750 Implemented
OK0779 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,089 $14,467 Implemented
OK0779 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,569 $0 Implemented
OK0779 # 08 Y:2009 08 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,812 $1,944 Implemented
OK0779 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $7,677 $989 Not Implemented
LL0314 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $149,374 $64,560 Implemented
LL0314 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $74,110 $7,510 Implemented
LL0314 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $59,298 $5,092 Not Implemented