IAC Assessment: NC0422
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0422
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2011
Principal Product Gas dispensers
NAICS 333913 - Measuring and Dispensing Pump Manufacturing
SIC 3586 - Measuring And Dispensing Pumps
Sales $100,000,000-$500,000,000
# of Employees 1,100
Plant Area (Sq.Ft.) 885,000
Annual Production 25,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $850,650 17,352,000 kWh $0.05
Electricity Demand $183,072 40,206 kW-months/year $4.55
Electricity Fees $36 - $ -
Natural Gas $319,758 55,184 MMBtu $5.79
TOTAL ENERGY COSTS $1,353,516
RECOMMENDED SAVINGS* $97,949 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$3,623
Cost:
$1,000
- - - - $3,623 623 - - - - - - -
-
kWh
-
-
kW-months/year
$3,623
623
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.1224 REPLACE BOILER Savings:
$17,336
Cost:
$37,000
- - - - $17,336 2,979 - - - - - - -
-
kWh
-
-
kW-months/year
$17,336
2,979
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$15,021
Cost:
$10,000
- - - - $8,429 1,488 - - - - $6,592 - -
-
kWh
-
-
kW-months/year
$8,429
1,488
MMBtu
-
-
$
-
-
$
$6,592
-
Tgal
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,316
Cost:
$1,618
- - - - $3,316 569 - - - - - - -
-
kWh
-
-
kW-months/year
$3,316
569
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,982
Cost:
$38,000
- - - - $8,982 1,543 - - - - - - -
-
kWh
-
-
kW-months/year
$8,982
1,543
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.2514 COVER OPEN TANKS Savings:
$11,237
Cost:
$15,000
$8,966 244,360 $2,271 335 - - - - - - - - $8,966
244,360
kWh
$2,271
335
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$15,795
Cost:
$1,500
$15,795 506,225 - - - - - - - - - - $15,795
506,225
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,815
Cost:
$22,930
- - - - $10,815 1,859 - - - - - - -
-
kWh
-
-
kW-months/year
$10,815
1,859
MMBtu
-
-
$
-
-
$
-
-
Tgal
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,211
Cost:
$100
$4,745 129,322 $1,466 178 - - - - - - - - $4,745
129,322
kWh
$1,466
178
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,027
Cost:
$100
$2,374 64,696 $733 89 - - $(-600) - $(-480) - - - $2,374
64,696
kWh
$733
89
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-480)
-
$
-
-
Tgal
11: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$3,586
Cost:
-
$3,586 - - - - - - - - - - - $3,586
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$97,949
Cost:
$127,248
$35,466 944,603 $4,470 602 $52,501 9,061 $(-600) - $(-480) - $6,592 - $35,466
944,603
kWh
$4,470
602
kW-months/year
$52,501
9,061
MMBtu
$(-600)
-
$
$(-480)
-
$
$6,592
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption