IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,260

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0006 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,361 $27,064 Not Implemented
NT0006 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,552 $0 Not Implemented
NT0006 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $151,941 $2,205,000 Not Implemented
CI0009 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $46,339 $196,478 n/a
CI0009 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,591 $41,000 n/a
CI0009 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,199 $1,500 n/a
CI0009 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,281 $14,880 n/a
CI0009 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,574 $0 n/a
CI0009 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $4,832 $4,725 n/a
CI0009 # 07 Y:2023 07 2023 USE PHOTOCELL CONTROLS $4,055 $2,500 n/a
CC0015 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $278 $400 n/a
CC0015 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,040 $7,085 n/a
CC0015 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,983 $2,000 n/a
CC0015 # 04 Y:2023 04 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $199 $360 n/a
WV0641 # 01 Y:2023 01 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $235,798 $32,000 Not Implemented
WV0641 # 02 Y:2023 02 2023 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $189,197 $575,150 Not Implemented
WV0641 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $123,784 $178,886 Not Implemented
WV0641 # 04 Y:2023 04 2023 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $42,136 $4,100 Implemented
WV0641 # 05 Y:2023 05 2023 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $32,260 $112,625 Not Implemented
WV0641 # 06 Y:2023 06 2023 REDUCE VENTILATION AIR $16,843 $4,400 Implemented
WV0641 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,857 $5,425 Implemented
WV0641 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $917 $933 Implemented
WV0641 # 09 Y:2023 09 2023 INSULATE BARE EQUIPMENT $402 $758 Implemented
WM0198 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $19,115 $49,375 Not Implemented
WM0198 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $9,760 $1,950 Not Implemented