IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0480 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,290 $6,500 Not Implemented
MA0480 # 07 Y:2000 07 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,450 $27,000 Implemented
MA0480 # 08 Y:2000 08 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $8,620 $2,000 Implemented
MA0480 # 09 Y:2000 09 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $930 $0 Implemented
MA0480 # 10 Y:2000 10 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,660 $5,000 Implemented
MA0480 # 11 Y:2000 11 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,020 $0 Implemented
MA0480 # 12 Y:2000 12 2000 INSTALL OCCUPANCY SENSORS $12,215 $1,000 Implemented
HO0203 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,364 $31,595 Not Implemented
HO0203 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $323 $938 Not Implemented
HO0203 # 03 Y:1999 03 1999 INSTALL REPLACEMENT DOORS $1,799 $700 Not Implemented
HO0203 # 04 Y:1999 04 1999 RECOVER AND REUSE WASTE MATERIAL $5,258 $500 Not Implemented
HO0203 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $487 $500 Not Implemented
HO0201 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $736 $2,782 Not Implemented
HO0201 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $453 $1,161 Not Implemented
HO0201 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $6,391 $1,880 Not Implemented
HO0201 # 04 Y:1999 04 1999 SHADE WINDOWS FROM SUMMER SUN $3,456 $6,000 Implemented
HO0201 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,652 $4,000 Not Implemented
HO0201 # 06 Y:1999 06 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,200 $120 Not Implemented
HO0201 # 07 Y:1999 07 1999 IMPROVE SPACE COMFORT CONDITIONING $1,000 $3,282 Implemented
MA0380 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,018 $5,000 Implemented
MA0380 # 02 Y:1996 02 1996 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $1,037 $360 Not Implemented
MA0380 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $686 $1,040 Not Implemented
MA0380 # 04 Y:1996 04 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $616 $885 Implemented
MA0380 # 05 Y:1996 05 1996 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $503 $229 Not Implemented
MA0352 # 01 Y:1996 01 1996 FILTER AND REUSE HYDRAULIC OIL $8,867 $35,000 Not Implemented