IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,103

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1006 # 07 Y:2022 07 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $29,546 $160,998 Implemented
MA0845 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $108,785 $906,122 Not Implemented
MA0845 # 02 Y:2022 02 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,668 $60,000 Implemented
MA0845 # 03 Y:2022 03 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,709 $182,139 Not Implemented
MA0845 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,754 $14,292 Implemented
MA0845 # 05 Y:2022 05 2022 ADJUST VENTS TO MINIMIZE ENERGY USE $8,349 $10,667 Not Implemented
MA0845 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $6,066 $2,910 Not Implemented
MA0845 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,762 $505 Not Implemented
UU0208 # 01 Y:2022 01 2022 USE POWER DURING OFF-PEAK PERIODS $9,375 $9,500 Not Implemented
UU0208 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,476 $127,045 Implemented
UU0208 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $4,445 $12,840 Implemented
UU0208 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,292 $7,290 Implemented
UU0208 # 05 Y:2022 05 2022 INSTALL SKYLIGHTS $3,058 $10,560 Not Implemented
UU0208 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $107 Implemented
WV0632 # 01 Y:2022 01 2022 MINIMIZE WATER USAGE $12,558 $11,644 Not Implemented
WV0632 # 02 Y:2022 02 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $5,035 $3,423 Implemented
WV0632 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $4,403 $2,234 Not Implemented
WV0632 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,805 $706 Implemented
WV0632 # 05 Y:2022 05 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,169 $5,688 Not Implemented
WV0632 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,112 $1,037 Implemented
WV0632 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $865 $2,227 Not Implemented
WV0632 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $727 $92 Implemented
WV0632 # 09 Y:2022 09 2022 DEVELOP A REPAIR/REPLACE POLICY $714 $1,638 Implemented
WV0632 # 10 Y:2022 10 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $669 $3,115 Implemented
WV0632 # 11 Y:2022 11 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $456 $1,192 Implemented