IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0442 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $325 Implemented
KU0442 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,066 $9,950 Implemented
KU0442 # 08 Y:1994 08 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,058 $2,075 Implemented
KU0442 # 09 Y:1994 09 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,195 $8,640 Implemented
KU0442 # 10 Y:1994 10 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $435 $400 Implemented
KU0442 # 11 Y:1994 11 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $271 $130 Implemented
DS0009 # 01 Y:1994 01 1994 INSTALL OCCUPANCY SENSORS $543 $637 Implemented
DS0009 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,241 $5,955 Implemented
DS0009 # 03 Y:1994 03 1994 USE OPTIMUM THICKNESS INSULATION $6,304 $22,438 Not Implemented
DS0009 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $840 $2,700 Not Implemented
CO0311 # 01 Y:1994 01 1994 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $53,800 $7,000 Not Implemented
CO0311 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,400 $570 Implemented
CO0311 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,320 $3,890 Not Implemented
CO0311 # 04 Y:1994 04 1994 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,020 $3,500 Not Implemented
CO0311 # 05 Y:1994 05 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,030 $5,700 Not Implemented
CO0311 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $400 Implemented
OD0011 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,569 $77,523 Implemented
OD0011 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $683 Not Implemented
OD0011 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,089 $3,300 Implemented
OD0011 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,394 $9,618 Implemented
OD0011 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,970 $927 Implemented
OD0011 # 06 Y:1994 06 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,613 $860 Implemented
OD0011 # 07 Y:1994 07 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,051 $0 Implemented
SF0036 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,091 $4,219 Implemented
SF0036 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,761 $12,763 Implemented