IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,103

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0303 # 02 Y:1990 02 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $761 $800 Implemented
UD0303 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $276 $400 Not Implemented
UD0303 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,496 $3,102 Implemented
UD0304 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,855 $2,800 Not Implemented
UD0304 # 02 Y:1990 02 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $867 $1,000 Not Implemented
UD0304 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,928 $4,920 Implemented
UD0304 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $332 $0 Implemented
UD0304 # 05 Y:1990 05 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,558 $1,500 Implemented
UD0304 # 06 Y:1990 06 1990 RECOVER WASTE HEAT FROM EQUIPMENT $3,648 $7,000 Not Implemented
OR0065 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $5,924 $2,050 Implemented
OR0065 # 02 Y:1989 02 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,603 $1,075 Not Implemented
OR0065 # 03 Y:1989 03 1989 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $338 $150 Implemented
OR0065 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $394 $279 Implemented
OR0065 # 05 Y:1989 05 1989 OPTIMIZE PLANT POWER FACTOR $5,181 $5,400 Not Implemented
OR0065 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,845 $2,000 Implemented
AM0072 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,100 $82,000 Not Implemented
AM0072 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,470 $24,000 Not Implemented
AM0072 # 03 Y:1989 03 1989 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $9,950 $56,300 Not Implemented
AM0072 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,400 $1,000 Implemented
AM0072 # 05 Y:1989 05 1989 PAY UTILITY BILLS ON TIME $3,941 $0 Implemented
AM0072 # 06 Y:1989 06 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,900 $2,900 Implemented
AM0072 # 07 Y:1989 07 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,670 $350 Implemented
AM0072 # 08 Y:1989 08 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,085 $0 Implemented
AM0072 # 09 Y:1989 09 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $680 $0 Not Implemented
UD0301 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,313 $0 Not Implemented