IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,260

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0050 # 05 Y:1989 05 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,484 $1,000 Not Implemented
RU0050 # 06 Y:1989 06 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,367 $1,440 Not Implemented
MA0147 # 01 Y:1989 01 1989 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $9,019 $15,500 Not Implemented
MA0147 # 02 Y:1989 02 1989 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $182,460 $350,000 Not Implemented
MA0147 # 03 Y:1989 03 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $144 $41 Implemented
MA0147 # 04 Y:1989 04 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,136 $483 Not Implemented
MA0147 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $446 $331 Implemented
MA0147 # 06 Y:1989 06 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,080 $0 Implemented
UD0288 # 01 Y:1989 01 1989 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $441,279 $200,000 Not Implemented
UD0288 # 02 Y:1989 02 1989 REDUCE VENTILATION AIR $30,846 $10,000 Implemented
UD0288 # 03 Y:1989 03 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $23,159 $10,000 Implemented
UD0288 # 04 Y:1989 04 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $31,629 $90,000 Not Implemented
UD0288 # 05 Y:1989 05 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $803 $0 Implemented
AM0062 # 01 Y:1989 01 1989 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,350 $3,160 Not Implemented
AM0062 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,090 $7,752 Not Implemented
AM0062 # 03 Y:1989 03 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,440 $2,000 Not Implemented
AM0062 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $828 $500 Implemented
AM0062 # 05 Y:1989 05 1989 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $624 $420 Implemented
AM0062 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $95 Implemented
AM0062 # 07 Y:1989 07 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $300 $105 Implemented
AM0062 # 08 Y:1989 08 1989 INSTALL SET-BACK TIMERS $116 $0 Implemented
TN0362 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,858 $920 Implemented
TN0362 # 02 Y:1989 02 1989 KEEP LAMPS AND REFLECTORS CLEAN $2,524 $6,125 Not Implemented
TN0362 # 03 Y:1989 03 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,100 $0 Implemented
TN0362 # 04 Y:1989 04 1989 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $318 $820 Implemented