IAC Assessment: TN0406
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0406
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product METALLIC PARTS
NAICS n/a
SIC 3552 - Textile Machinery
Sales $1,000,000-$5,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 140,000 Pieces
Production Hrs. Annual 2,168
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $189,307 2,312,427 kWh $0.08
Natural Gas $27,658 5,308 MMBtu $5.21
TOTAL ENERGY COSTS $216,965
RECOMMENDED SAVINGS* $20,037 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.5194 REDESIGN PROCESS Savings:
$5,552
Cost:
$21,192
$5,552 67,702 - - $5,552
67,702
kWh
-
-
$
02: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$4,734
Cost:
$2,000
$4,734 57,737 - - $4,734
57,737
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,172
Cost:
$10,820
$3,172 38,687 - - $3,172
38,687
kWh
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,139
Cost:
-
$2,139 26,084 - - $2,139
26,084
kWh
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,202
Cost:
-
$1,202 14,654 - - $1,202
14,654
kWh
-
-
$
06: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$783
Cost:
$1,275
$697 8,499 $86 - $697
8,499
kWh
$86
-
$
07: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$461
Cost:
$1,124
$409 4,982 $52 - $409
4,982
kWh
$52
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$721
Cost:
$1,320
$721 8,792 - - $721
8,792
kWh
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$769
Cost:
$653
$769 9,379 - - $769
9,379
kWh
-
-
$
10: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$264
Cost:
$335
$264 3,224 - - $264
3,224
kWh
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$240
Cost:
$120
$240 2,931 - - $240
2,931
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$20,037
Cost:
$38,839
$19,899 242,671 $138 - $19,899
242,671
kWh
$138
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes