IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,260

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0195 # 13 Y:1986 13 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $272 $0 Implemented
KU0195 # 14 Y:1986 14 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $122 $0 Not Implemented
MA0059 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,336 $3,400 Implemented
MA0059 # 02 Y:1986 02 1986 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,030 $2,025 Not Implemented
MA0059 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,217 $2,300 Implemented
KU0191 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,594 $2,592 Implemented
KU0191 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,988 $0 Not Implemented
KU0191 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $423 $100 Implemented
KU0191 # 04 Y:1986 04 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $221 $0 Implemented
KU0191 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $525 $0 Implemented
KU0191 # 06 Y:1986 06 1986 IMPROVE LUBRICATION PRACTICES $151 $138 Not Implemented
GT0277 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $443 $451 Implemented
GT0277 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,113 $5,670 Implemented
GT0277 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $604 $137 Implemented
GT0277 # 04 Y:1986 04 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $543 $2,000 Implemented
UD0190 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,737 $0 Not Implemented
UD0190 # 02 Y:1986 02 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,588 $10,000 Not Implemented
UD0190 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,491 $38,950 Not Implemented
UD0190 # 04 Y:1986 04 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,631 $10,070 Implemented
TN0273 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $61,908 $4,200 Implemented
TN0273 # 02 Y:1986 02 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $35,336 $79,000 Not Implemented
TN0273 # 03 Y:1986 03 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,635 $2,800 Implemented
TN0273 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,293 $1,680 Implemented
TN0273 # 05 Y:1986 05 1986 HEAT WATER WITH EXHAUST HEAT $1,562 $7,200 Not Implemented
TN0273 # 06 Y:1986 06 1986 USE MINIMUM STEAM OPERATING PRESSURE $1,249 $0 Not Implemented