IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

209

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0330 # 02 Y:1990 02 1990 RECOVER AND REUSE COOLING WATER $8,744 $10,000 Not Implemented
UD0330 # 01 Y:1990 01 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,879 $0 Not Implemented
UD0330 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $8,017 $15,000 Implemented
UD0330 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $5,716 $1,500 Not Implemented
UD0330 # 04 Y:1990 04 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,681 $500 Not Implemented
AS0015 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,814 $0 Implemented
RU0103 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $664 $3,750 Implemented
AS0015 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,924 $4,119 Implemented
OK0326 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $518 $904 Not Implemented
AM0103 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,810 $9,500 Implemented
AM0103 # 07 Y:1990 07 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $674 $160 Implemented
AS0015 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,956 $1,000 Implemented
AM0103 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,895 $990 Implemented
OK0326 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,545 $0 Implemented
AM0103 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $18,300 $28,390 Implemented
OK0326 # 01 Y:1990 01 1990 INSULATE BARE EQUIPMENT $1,211 $1,382 Implemented
AS0015 # 07 Y:1990 07 1990 KEEP LAMPS AND REFLECTORS CLEAN $15,919 $20,225 Implemented
AS0015 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,240 $808 Not Implemented
OK0326 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $87 $0 Implemented
AM0103 # 06 Y:1990 06 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $944 $0 Implemented
AS0015 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,214 $520 Not Implemented
AS0015 # 08 Y:1990 08 1990 INSTALL SET-BACK TIMERS $1,698 $450 Implemented
AM0103 # 01 Y:1990 01 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $25,900 $0 Implemented
AM0103 # 05 Y:1990 05 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,480 $0 Implemented
AS0015 # 05 Y:1990 05 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,041 $0 Implemented