Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

442

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0195 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $206 $350 Not Implemented
WI0195 # 07 Y:1993 07 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $671 $0 Implemented
WI0195 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $21,307 $17,400 Implemented
WI0195 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,037 $1,050 Not Implemented
WI0195 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $132 $0 Not Implemented
WI0195 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $859 $0 Not Implemented
WI0195 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $247 $150 Not Implemented
WI0195 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,291 $3,946 Not Implemented
WI0195 # 10 Y:1993 10 1993 INSULATE BARE EQUIPMENT $187 $660 Not Implemented
WI0195 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $384 $588 Not Implemented
OK0422 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,188 $4,152 Implemented
OK0422 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,201 $7,220 Not Implemented
OK0422 # 01 Y:1993 01 1993 REPAIR OR REPLACE STEAM TRAPS $170,442 $0 Implemented
OK0422 # 06 Y:1993 06 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $671 $866 Implemented
OK0422 # 02 Y:1993 02 1993 INCREASE AMOUNT OF CONDENSATE RETURNED $126,322 $90,000 Implemented
OK0422 # 03 Y:1993 03 1993 REPAIR OR REPLACE STEAM TRAPS $106,473 $4,025 Implemented
OK0420 # 01 Y:1993 01 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,284 $10,500 Not Implemented
UD0418 # 05 Y:1993 05 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,259 $6,000 Implemented
OK0420 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $559 Implemented
OK0420 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,406 $5,658 Implemented
OK0420 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $390 $1,000 Not Implemented
UD0418 # 03 Y:1993 03 1993 INSTALL EFFICIENT RECTIFIERS $1,456 $15,000 Implemented
UD0418 # 01 Y:1993 01 1993 PAY UTILITY BILLS ON TIME $2,115 $0 Not Implemented
UD0418 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $14,702 $9,250 Implemented
UD0418 # 06 Y:1993 06 1993 RECOVER AND REUSE COOLING WATER $12,300 $1,000 Implemented