IAC Assessment: OK0422
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0422
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1993
Principal Product Refined Waxes
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 48,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $435,482 11,274,619 kWh $0.04
Natural Gas $1,943,555 917,532 MMBtu $2.12
TOTAL ENERGY COSTS $2,379,037
RECOMMENDED SAVINGS* $412,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $409,096
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$170,442
Cost:
-
- - $170,442 71,735 -
-
kWh
$170,442
71,735
MMBtu
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$126,322
Cost:
$90,000
- - $126,322 30,811 -
-
kWh
$126,322
30,811
MMBtu
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$106,473
Cost:
$4,025
- - $106,473 44,802 -
-
kWh
$106,473
44,802
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,188
Cost:
$4,152
$5,188 119,578 - - $5,188
119,578
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,201
Cost:
$7,220
- - $3,201 1,219 -
-
kWh
$3,201
1,219
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$671
Cost:
$866
- - $671 317 -
-
kWh
$671
317
MMBtu
TOTAL RECOMMENDED Savings:
$412,297
Cost:
$106,263
$5,188 119,578 $407,109 148,884 $5,188
119,578
kWh
$407,109
148,884
MMBtu
TOTAL IMPLEMENTED Savings:
$409,096
Cost:
$99,043
$5,188 119,578 $403,908 147,665 $5,188
119,578
kWh
$403,908
147,665
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas