Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
308
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0353 # 02 Y:2008 | 02 | 2008 | INSTALL OCCUPANCY SENSORS | $302 | $528 | Not Implemented |
BD0353 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,757 | $5,244 | Not Implemented |
BD0353 # 09 Y:2008 | 09 | 2008 | USE EVAPORATION TO CONCENTRATE MATERIAL | $6,150 | $7,400 | Not Implemented |
BD0353 # 08 Y:2008 | 08 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,315 | $3,150 | Not Implemented |
BD0353 # 07 Y:2008 | 07 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $4,341 | $5,300 | Not Implemented |
BD0353 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,431 | $200 | Not Implemented |
BD0353 # 03 Y:2008 | 03 | 2008 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,207 | $30 | Not Implemented |
BD0353 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $324 | $225 | Not Implemented |
BD0353 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $437 | $1,000 | Not Implemented |
GT0858 # 02 Y:2008 | 02 | 2008 | Equipment Scheduling | $5,630 | $0 | Not Implemented |
GT0858 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $475 | $900 | Not Implemented |
GT0858 # 05 Y:2008 | 05 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,063 | $10,879 | Implemented |
GT0858 # 01 Y:2008 | 01 | 2008 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $5,046 | $0 | Implemented |
GT0858 # 04 Y:2008 | 04 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,485 | $4,500 | Implemented |
GT0858 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,520 | $5,835 | Not Implemented |
GT0858 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $16,189 | $33,180 | Implemented |
GT0858 # 06 Y:2008 | 06 | 2008 | USE SOLAR HEAT TO HEAT WATER | $3,687 | $7,500 | Not Implemented |
OR0543 # 01 Y:2008 | 01 | 2008 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $244,531 | $29,019 | Not Implemented |
OR0543 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,542 | $40,950 | Implemented |
OR0543 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,017 | $28,000 | Not Implemented |
OR0543 # 04 Y:2008 | 04 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,107 | $413 | Implemented |
OR0543 # 05 Y:2008 | 05 | 2008 | INSTALL OCCUPANCY SENSORS | $19,521 | $31,119 | Implemented |
OR0543 # 06 Y:2008 | 06 | 2008 | OPTIMIZE PLANT POWER FACTOR | $10,290 | $54,000 | Implemented |
OR0543 # 07 Y:2008 | 07 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,310 | $148,560 | Implemented |
OR0543 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,510 | $0 | Implemented |