IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

308

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0353 # 09 Y:2008 09 2008 USE EVAPORATION TO CONCENTRATE MATERIAL $6,150 $7,400 Not Implemented
BD0353 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,315 $3,150 Not Implemented
BD0353 # 07 Y:2008 07 2008 USE RADIANT HEATER FOR SPOT HEATING $4,341 $5,300 Not Implemented
BD0353 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,431 $200 Not Implemented
BD0353 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $302 $528 Not Implemented
BD0353 # 03 Y:2008 03 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $1,207 $30 Not Implemented
BD0353 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,757 $5,244 Not Implemented
BD0353 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $324 $225 Not Implemented
BD0353 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $437 $1,000 Not Implemented
GT0858 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,063 $10,879 Implemented
GT0858 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $16,189 $33,180 Implemented
GT0858 # 06 Y:2008 06 2008 USE SOLAR HEAT TO HEAT WATER $3,687 $7,500 Not Implemented
GT0858 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $475 $900 Not Implemented
GT0858 # 01 Y:2008 01 2008 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,046 $0 Implemented
GT0858 # 02 Y:2008 02 2008 Equipment Scheduling $5,630 $0 Not Implemented
GT0858 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,520 $5,835 Not Implemented
GT0858 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,485 $4,500 Implemented
OR0543 # 13 Y:2008 13 2008 UPGRADE CONTROLS ON COMPRESSORS $7,300 $5,700 Implemented
OR0543 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,017 $28,000 Not Implemented
OR0543 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $10,290 $54,000 Implemented
OR0543 # 09 Y:2008 09 2008 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $78,900 $132,800 Implemented
OR0543 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,500 $43,600 Implemented
OR0543 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,510 $0 Implemented
OR0543 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,310 $148,560 Implemented
OR0543 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $2,107 $413 Implemented