IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

285

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0361 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,285 $59,157 Implemented
MS0361 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $604 Not Implemented
MS0361 # 02 Y:2010 02 2010 BURN A LESS EXPENSIVE GRADE OF FUEL $28,668 $57,500 Not Implemented
MS0361 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,596 $322 Implemented
UM0380 # 03 Y:2010 03 2010 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $30,357 $350,000 Not Implemented
UM0380 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $861 $3,000 Not Implemented
UM0380 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $1,500 Not Implemented
UM0380 # 04 Y:2010 04 2010 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $21,456 $250,000 Not Implemented
UM0380 # 05 Y:2010 05 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,024 $14,751 Not Implemented
UM0380 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $2,880 $2,484 Not Implemented
UM0380 # 09 Y:2010 09 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $273 $1,400 Not Implemented
UM0380 # 07 Y:2010 07 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,245 $5,500 Not Implemented
UM0380 # 06 Y:2010 06 2010 USE HEAT PUMP FOR SPACE CONDITIONING $7,702 $217,800 Not Implemented
OK0800 # 02 Y:2010 02 2010 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,667 $2,700 Implemented
OK0800 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,533 $32,670 Not Implemented
OK0800 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,134 $1,678 Implemented
OK0800 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,134 $706 Implemented
OK0800 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $334 Implemented
OK0800 # 07 Y:2010 07 2010 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $3,127 $0 Not Implemented
OK0800 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $860 $1,865 Implemented
GT0875 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,380 $1,500 Implemented
GT0875 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $899 $1,555 Implemented
GT0875 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,718 $121,175 Implemented
GT0875 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $2,340 $2,940 Implemented
GT0875 # 06 Y:2010 06 2010 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $114,205 $196,875 Not Implemented