IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
Reset
SIC 3511 Turbines And Turbine Generator Sets
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0259 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,332 $5,655 Implemented
ME0259 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,027 $9,340 Implemented
ME0259 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $0 Implemented
ME0259 # 04 Y:1999 04 1999 COMBINE UTILITY METERS $456 $230 Implemented
ME0259 # 05 Y:1999 05 1999 COMBINE UTILITY METERS $450 $720 Implemented
ME0259 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $370 $1,000 Not Implemented
ME0259 # 07 Y:1999 07 1999 RECOVER WASTE HEAT FROM EQUIPMENT $365 $400 Implemented
ME0259 # 08 Y:1999 08 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $285 $215 Implemented
ME0259 # 09 Y:1999 09 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $14,100 $955,000 Implemented
ME0259 # 10 Y:1999 10 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,290 $2,460 Not Implemented
ME0259 # 11 Y:1999 11 1999 USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING $917 $0 Implemented
ME0259 # 12 Y:1999 12 1999 INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING $473 $5,240 Not Implemented
ME0259 # 13 Y:1999 13 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $292 $0 Not Implemented