IAC Assessment: ME0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product Impellers
NAICS n/a
SIC 3511 - Turbines And Turbine Generator Sets
Sales $5,000,000-$10,000,000
# of Employees 52
Plant Area (Sq.Ft.) 25,600
Annual Production 1,250 Pieces
Production Hrs. Annual 4,750
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,997 538,980 kWh $0.09
Electricity Demand $150,858 1,715 kW-months/year $87.96
Electricity Fees $1,129 - $ -
Natural Gas $4,725 675 MMBtu $7.00
TOTAL ENERGY COSTS $224,859
RECOMMENDED SAVINGS* $30,253 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,828
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$7,332
Cost:
$5,655
$7,332 81,477 - - - - - - - - - - - - $7,332
81,477
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,027
Cost:
$9,340
$1,605 17,878 $422 48 - - - - - - - - - - $1,605
17,878
kWh
$422
48
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$896
Cost:
-
$896 9,965 - - - - - - - - - - - - $896
9,965
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.8112 COMBINE UTILITY METERS Savings:
$456
Cost:
$230
- - - - - - - - - - $456 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$456
-
$
-
-
$
05: 2.8112 COMBINE UTILITY METERS Savings:
$450
Cost:
$720
- - - - - - - - - - $450 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$450
-
$
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$370
Cost:
$1,000
$370 4,103 - - - - - - - - - - - - $370
4,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$365
Cost:
$400
- - - - $365 49 - - - - - - - - -
-
kWh
-
-
kW-months/year
$365
49
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$285
Cost:
$215
$285 3,224 - - - - - - - - - - - - $285
3,224
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$14,100
Cost:
$955,000
- - - - - - $14,100 1,024 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,100
1,024
gal
-
-
lb
-
-
$
-
-
$
10: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$2,290
Cost:
$2,460
- - - - - - - - - - $2,290 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$2,290
-
$
-
-
$
11: 3.8134 USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING Savings:
$917
Cost:
-
- - - - - - $917 183 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$917
183
gal
-
-
lb
-
-
$
-
-
$
12: 3.7223 INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING Savings:
$473
Cost:
$5,240
- - - - - - $473 37 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$473
37
gal
-
-
lb
-
-
$
-
-
$
13: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$292
Cost:
-
- - - - - - - - $80 2,667 - - $212 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$80
2,667
lb
-
-
$
$212
-
$
TOTAL RECOMMENDED Savings:
$30,253
Cost:
$980,260
$10,488 116,647 $422 48 $365 49 $15,490 1,244 $80 2,667 $3,196 - $212 - $10,488
116,647
kWh
$422
48
kW-months/year
$365
49
MMBtu
$15,490
1,244
gal
$80
2,667
lb
$3,196
-
$
$212
-
$
TOTAL IMPLEMENTED Savings:
$26,828
Cost:
$971,560
$10,118 112,544 $422 48 $365 49 $15,017 1,207 - - $906 - - - $10,118
112,544
kWh
$422
48
kW-months/year
$365
49
MMBtu
$15,017
1,207
gal
-
-
lb
$906
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost