IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3524 Lawn And Garden Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0384 # 09 Y:2004 09 2004 INSULATE BARE EQUIPMENT $902 $251 Implemented
AS0384 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $904 $961 Not Implemented
AS0384 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,575 $20 Implemented
AS0384 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,696 $3,600 Not Implemented
AS0384 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,859 $180 Implemented
AS0384 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,206 $88,805 Not Implemented
AS0384 # 03 Y:2004 03 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $26,000 $22,316 Implemented
AS0384 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,877 $495 Not Implemented
AS0384 # 01 Y:2004 01 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $58,500 $1,130 Not Implemented
AS0124 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $120 Implemented
AS0124 # 10 Y:1994 10 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,158 $50,250 Not Implemented
AS0124 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,151 $0 Implemented
AS0124 # 08 Y:1994 08 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,997 $6,080 Implemented
AS0124 # 07 Y:1994 07 1994 USE SYNTHETIC LUBRICANT $2,924 $3,915 Not Implemented
AS0124 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $3,939 $5,720 Not Implemented
AS0124 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $741 $970 Not Implemented
AS0124 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $553 $540 Implemented
AS0124 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $356 $0 Not Implemented
AS0124 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,163 $82,461 Implemented
AS0100 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $400 Implemented
AS0100 # 08 Y:1993 08 1993 USE RADIANT HEATER FOR SPOT HEATING $2,175 $4,000 Not Implemented
AS0100 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $637 $600 Not Implemented
AS0100 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $989 $628 Not Implemented
AS0100 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,123 $2,470 Not Implemented
AS0100 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $380 Not Implemented