IAC logo
IAC Assessment: AS0384
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0384
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2004
Principal Product Lawn Trimmers
NAICS 333112 - Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing
SIC 3524 - Lawn And Garden Equipment
Sales $100,000,000-$500,000,000
# of Employees 560
Plant Area (Sq.Ft.) 506,551
Annual Production 500,000 Pieces
Production Hrs. Annual 8,712
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $549,826 8,152,435 kWh $0.07
Electricity Demand $45,863 18,653 kW-months/year $2.46
Electricity Fees $53,401 - $ -
Natural Gas $48,138 5,423 MMBtu $8.88
TOTAL ENERGY COSTS $767,265
RECOMMENDED SAVINGS* $156,519 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,336
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$58,500
Cost:
$1,130
- - - - $58,500 - -
-
kWh
-
-
kW-months/year
$58,500
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$34,877
Cost:
$495
$34,877 1,003,080 - - - - $34,877
1,003,080
kWh
-
-
kW-months/year
-
-
$
03: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$26,000
Cost:
$22,316
- - - - $26,000 - -
-
kWh
-
-
kW-months/year
$26,000
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,206
Cost:
$88,805
$5,369 140,315 $7,837 590 - - $5,369
140,315
kWh
$7,837
590
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,859
Cost:
$180
$10,251 294,826 $5,608 406 - - $10,251
294,826
kWh
$5,608
406
kW-months/year
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,696
Cost:
$3,600
$2,389 68,714 $1,307 95 - - $2,389
68,714
kWh
$1,307
95
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,575
Cost:
$20
$1,407 39,377 $1,168 84 - - $1,407
39,377
kWh
$1,168
84
kW-months/year
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$904
Cost:
$961
$560 16,096 $344 25 - - $560
16,096
kWh
$344
25
kW-months/year
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$902
Cost:
$251
$583 16,798 $319 23 - - $583
16,798
kWh
$319
23
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$156,519
Cost:
$117,758
$55,436 1,579,206 $16,583 1,223 $84,500 - $55,436
1,579,206
kWh
$16,583
1,223
kW-months/year
$84,500
-
$
TOTAL IMPLEMENTED Savings:
$45,336
Cost:
$22,767
$12,241 351,001 $7,095 513 $26,000 - $12,241
351,001
kWh
$7,095
513
kW-months/year
$26,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes