IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,768

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0186 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $17,400 $68,000 Not Implemented
AM0186 # 04 Y:1993 04 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,300 $0 Not Implemented
AM0186 # 05 Y:1993 05 1993 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,460 $0 Implemented
AM0186 # 06 Y:1993 06 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,540 $2,000 Not Implemented
KU0397 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,945 $3,615 Implemented
KU0397 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $800 $4,524 Implemented
OR0174 # 01 Y:1993 01 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $991 $60 Not Implemented
OR0174 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $185 $632 Implemented
OR0174 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $378 $916 Implemented
OR0174 # 04 Y:1993 04 1993 OPTIMIZE PLANT POWER FACTOR $3,112 $3,750 Not Implemented
OR0174 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $1,000 Implemented
WV0002 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,508 $1,357 Not Implemented
WV0002 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,068 $5,630 Implemented
WV0002 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $473 $290 Implemented
WV0002 # 04 Y:1993 04 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $300 $86 Implemented
WV0002 # 05 Y:1993 05 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,572 $5,700 Implemented
WV0002 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $25 $35 Implemented
WV0002 # 07 Y:1993 07 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,837 $690 Implemented
WV0002 # 08 Y:1993 08 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $650 $0 Implemented
WI0175 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $10,455 $8,000 Not Implemented
WI0175 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,259 $0 Implemented
WI0175 # 03 Y:1993 03 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,118 $675 Not Implemented
WI0175 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,672 $4,650 Implemented
WI0175 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,329 $0 Not Implemented
WI0175 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $972 $800 Not Implemented